Basic Concrete Knowledge for Tacoma, Washington

Before you begin your project, it is important to properly plan and prepare. Proper planning will save time in the end, and helps to assure your satisfaction with the product. If you are unsure of how much concrete you need or if the area is suitable for concrete, give Cascade Mobile Mix Concrete & Line Pumping a call today at 253-847-9119. Our staff is experienced in all types of concrete pouring situations and will answer all of your questions.
Thickness
For common household projects - driveways, walkways, and patios – 4 inches thick should do the trick. Thicker concrete (i.e. 6" is recommended for heavy-duty use or heavy vehicles) It is recommended to use a ¾ minus crushed gravel compacted base. You can get a compactor from a rental equipment store. Drainage industry standard calls for a slope of ¼ inch per foot away from structures. Some projects may be able to use ⅛ inch slope.
Excavation
While taking care to only dig as deep as necessary (keeping an eye out for power lines; if you are unsure where lines are, call your utilities for a locator), ensure you remove tree roots, leaves, wood and any other organic matter in the desired area.
Isolation
Install expansion joint material anywhere concrete will come into contact with existing slabs, steps or buildings. The expansion joint should reach the bottom of the slab; this ensures the new slab will be separated from existing structures.
Now that you have your planning down, we suggest you review our Concrete Calculator to determine your exact needs.
 
Specifications
Specifying the correct mix for your job can be the difference between long-term satisfaction and disaster. Concrete specifications consist of strength (PSI), slump (thickness) and chemical additives.
Strength
Concrete Exposed to freezing and thawing temperatures should have a compression strength of 3000 psi and have at least 5% entrained air (+/- 1.5%). Air entrainment allows for the expanded water when frozen to travel into the air voids created by the air additive. Without the air, concrete is at risk for cracking.
Slump
For our environment, we recommend a slump of 4 inches (+/- 1"). Note: a slump greater than 4" may prolong the time you have to wait before finishing, particularly in cool weather. It will also increase the tendency for shrinkage cracking.
Compaction
Will ensure your slab won't settle or vary in thickness, make sure to compact the soil/gravel base in the desired area.
Forming
Take care to stake your forms securely to the ground, while paying close attention to the slope (for proper drainage). 2x4s are perfectly adequate for use as forms; though make sure you have the desired thickness (usually 4") available at the edges.
Chemical Additives
In addition to air entraining admixtures, chemical additives may be used to accelerate or retard setting, reduce water or plasticize the concrete.
Cascade Mobile Mix Concrete & Line Pumping's concrete is a high-quality concrete and we run a plasticizer in our concrete unless requested not too.
Concrete Basics | Cascade Mobile Mix Concrete | Graham, WA
Placing
Concrete delivery should be closely coordinated with placing and finishing operations. Concrete should not be poured faster than it can be worked - spreading, consolidating, bull floating. Instead, concrete should be poured continuously as near as possible to its final position. You should never dump concrete into separate piles and work together.


Consolidation
Placing concrete in forms and then consolidating is popular for some types of construction. The consolidation process uses vibration and gravity to compact fresh concrete within the forms and around embedded items and reinforcement. This process eliminates unwanted pockets of trapped air, honeycomb, and stone while maintaining significant amounts of entrained air. The vibration temporarily suspends the natural friction between the aggregate particles, causing the concrete to behave as a liquid. Internal friction resumes as the vibration is stopped.

Finishing
Visible concrete - slabs used for driveways, patios, etc. - will often need finishing. You can finish your concrete in many ways, including color tinting and texturing. Patterned-stamped finishes are very popular on projects of all sizes. Some surfaces may require just strike off and screeding to proper contour and elevation. Others may be better off with a broomed, troweled or floated finish. Strike off and screeding is the process of cutting off excess concrete to bring the top surface of the slab to proper grade. A straight edge is moved across the concrete with a sawing motion and progresses forward a short distance with each movement.
Bull floating eliminates high and low spots and embeds large aggregate particles immediately after strike off. This looks like a long-handled straight edge pulled across the concrete. Jointing is required to eliminate unsightly random cracks. Contraction joints are made with a hand groover or by inserting strips of plastic, wood, metal, or preformed joint material into the unhardened concrete. Saw cut joints can be made after the concrete is sufficiently hard or strong enough to prevent raveling. After the concrete has been jointed, it should be floated with a wood or metal hand float or with a finishing machine using float blades. This embeds aggregate particles just beneath the surface; removes slight imperfections, humps, and voids; and compacts the mortar at the surface in preparation for additional finishing operations. Where a smooth, hard, dense surface is desired, floating should be followed by steel troweling. Troweling should not be done on a surface that has not been floated; troweling after only bull floating is not an adequate finish procedure. A slip-resistant surface can be produced by brooming before the concrete has thoroughly hardened, but it should be sufficiently hard to retain the scoring impression.
Concrete Finishing | Cascade Mobile Mix Concrete | Graham, WA
Curing
Curing is one of the most important steps in concrete construction, because proper curing greatly increases concrete strength and durability. Concrete hardens as a result of hydration: the chemical reaction between cement and water. However, hydration occurs only if water is available and if the concrete's temperature stays within a suitable range. During the curing period, from five to seven days after placement for conventional concrete – the concrete surface needs to be kept moist to permit the hydration process. The most common method of curing (and one of the simplest) is to utilize a liquid membrane, which is sprayed or rolled on the surface of a slab after finishing to prevent premature drying of the surface. Water may be used when you are able to ensure constant wetting for at least 3 days.
 
Curing in Extreme Weather
Temperature extremes make it difficult to properly cure concrete. On hot days, too much water is lost by evaporation from newly placed concrete. If the temperature drops too close to freezing, hydration slows to nearly a standstill. Under these conditions, concrete ceases to gain strength and other desirable properties. In general, the temperature of new concrete should not be allowed to fall below 50°F during the curing period. Membrane curing does not keep the concrete warm enough in freezing temperature, nor does calcium chloride accelerator prevent concrete from freezing. Only adequate insulation or heating will maintain proper curing temperatures during freezing weather.

Curing Shortcuts to Avoid Compaction
Avoid any curing method that lets the surface dry in a short time. Quick drying stops the hardening process, thus making a weak surface that is likely to scale.
 
Drying
After curing, newly placed outdoor concrete needs time to dry in warm air. For best results, plan to place your concrete early enough in the season so that it has one month of temperatures above 40°F for curing and still another month for drying out before hard freezes are expected.
Sealing
Water-repellent coatings or sealers can help prevent damage from freeze/thaw cycles and salting. They deter water from getting into the surface pores. Newly cured concrete should have a period of air-drying before being sealed.
 
First Winter
Do not use salt or other deicers during the first winter. Use sand instead to improve traction. Even light applications of salt, or salt carried on cars may cause severe scaling of newly placed concrete. Fertilizers are not an acceptable deicer at any time.
Saturation
Proper drainage should be maintained to avoid saturation of concrete.

Why Choose Us?

  • Deliveries 24/7 from 3 locations by appointments
  • Dependable delivery timelines
  • Work with homeowners and contractors
  • Residential, commercial, and industrial pouring available
  • Very knowledgeable and trained staff and crew
  • From small to large jobs, we will assist you
  • Locally and family owned company, since 1979
  • Serving all of Western Washington state
  • Our line pump truck can reach most areas
We deliver concrete to Pierce, South King, Lewis and Thurston Counties. Upon request we can go anywhere and are capable of pouring in remote wilderness areas, on barges in our waterways, whatever you need is, we will try our best to accommodate you.

More About Concrete Maintenance